Our company has been successfully engaged in the production and sale of Jack-up barge PD 3 for more than 10 years, and also carries out engineering-geological surveys around the world.
Works in hard-to-reach places
Easier delivery and installation
The price is lower than analogs
We train your staff
Shipping by sea container
Advantages
The main advantages of a platform are ease of operation, cost and ability to work in hard-to-reach places and reservoirs with the large tidal phenomenon. The barge has two independent thrusters with a capacity of 60 hp, which facilitate movement and positioning at the drilling point. The panton is designed for a rig with a drilling weight of up to 6 tons.
Main Dimension
Lenght
Width
Depth
Leg lenght
Leg dia
11.00 m
5.2 m
1.0 m
13-16 m
0.299 m
Operating Condidion
Wind velocity
Maximum height of wave
Current velocity
10 m/sec
1.0 meter
6 m/sec
Working Condition
Area of work table
Maximum sea depth
Working road (max)
11×5 m
13 m
12 tcn
Power Pack
Main pump engine
Generator
Main pump
Time for lift up
Time for lift down
D 245
12 V
Hb 4 / Hb 50
1 m/min
1 m/min
Mooring System
Winches
Anchors
Moon pool
4
4
Condition 1.5Knot under tide | 1.5m under wave height | 15m/sec under wind velocity
0.5(W) x 0.5(L)/meter
We organize engineering-geological surveys
You only need a truck to deliver the PD3 to your place of work*
Assembly is fast and easy
Same as the result
Our experience allows us to carry out work around the world and perform various tasks related to engineering and geological surveys.
Drilling can be carried out both in warm and cold water at air temperatures from -15 to +40 C / from 12,2 to 104 F. The admissible ice thickness is 10 cm. At a depth of 25 cm to 10 m stabs (legs) are used, the drilling depth is up to 150 m. At a depth of 11 m to 40 m the pontoon is anchored, the drilling depth is up to 25 m. Operation at a wave of no more than 1 m. Our equipment has performed work at such facilities as Nord Stream, Lakhta Center, Federal Road “Western High-Speed Diameter”, NPP in Alexandria (Egypt), construction of a port in Guinea, and this is only 5% of the total experience.
Do you want to buy a Jack-up barge, ask a question, or hire our team to carry out the work...
Let us know what work you need to do and we will advise you on the possibility of using Jack-up barge PD 3 in your projects
About company
We have been manufacturing and operating Jack-up barge for more than 10 years. Our team of experienced engineers has developed and improved a unique platform that allows you to perform complex work on the water while reducing costs and time by 2 times. We also develop and produce