Examples of our work

We carry out works around the world in coastal areas, rivers and other bodies of water.
More details can be found here

Works in Kronstadt, Russia

The drilling was carried out in an ice cover 20-25 cm thick, using icebreaking tugs. The platform was moved using anchor winches tied to the shore.

The water column is 7 m, the depth of drilling on the ground is 50 m. The air temperature is -15 Celsius.
Launching the barge
You only need a truck to deliver
the PD3 to your place of work*
Assembly is fast and easy
Same as the result
Our experience allows us to carry out work around the world and perform various tasks related to engineering and geological surveys.
Installation of the drilling rig on a barge at the berth
Barge at the drilling point
You only need a truck to deliver
the PD3 to your place of work*
Assembly is fast and easy
Same as the result
Our experience allows us to carry out work around the world and perform various tasks related to engineering and geological surveys.

Drilling for a port in West Africa, Guinea on the Fatala River

Column of water up to 9 m, tidal phenomena 4 m, depth of the borehole 25 m on the ground of which 15 m on rocks.

The work time is 15 days, the total drilling footage is 200 linear meters on the ground.

Do you want to buy a Jack-up barge, ask a question, or hire our team to carry out the work...

Contact us via the feedback form or by email sale@jack-upbarge.tech

Let us know what work you need to do and we will advise you on the possibility of using Jack-up barge PD 3 in your projects